About
The Sprint Planner skill for Claude Code automates the transition from high-level planning to executable engineering tasks. By analyzing Product Requirement Documents (PRD) and Software Design Documents (SDD), it generates granular 2.5-day sprints complete with deliverables, acceptance criteria, and technical task lists. It operates with a high-integrity protocol that mandates factual grounding via direct citations from source files and manages project state within a dedicated directory, ensuring plans are realistic, traceable, and perfectly aligned with architectural constraints.